M8 motorway Woodside Viaduct inspection, Glasgow, Scotland, UK
Glasgow, Scotland, UK. 23 March 2021. Glasgow, Scotland, UK. An engineer on the viaduct during lane closures on the M8inspects the structural integrity of the concrete viaduct. Photo shows severe concrete spalling and corrosion of steel reinforcement bars at half -joints where the bridge superstructure is supported by the pier. All of the bridge piers and half-joints have been marked for remedial measures and repair which will require lengthy lane closures .Iain Masterton/Alamy live News
Add to Cart Add to Lightbox Download- Filename
- 20210323-_DSB9097.jpg
- Copyright
- Iain Masterton
- Image Size
- 5300x3533 / 9.4MB
- https://www.photoshelter.com/support/license
- https://www.iainmasterton.com/about
-
Glasgow Scotland UK united kingdom britain british woodside viaduct motorway bridge viaducts infrastructure transport transportation road bridge bridge deck repairs maintenance inspection damage damaged condition concrete spalling old civil engineering structural engineering m8 motorway urban highway bridges
- Contained in galleries
- Scotland Image Gallery

